MUNICIPAL |
|||||
AQUA PA ENGINEERING SERVICES |
|||||
![]() |
|||||
Brush Valley Wells 1 & 2 |
|||||
Columbia County, Pennsylvania |
|||||
Electrical Engineering for a new well station with 22,000 gallon clearwell and two 200 HP, 700 GPM sendout pumps. Electrical Work included new electric service, power wiring, motor control center with solid state soft starters, normal and emergency lighting, alarm systems, and control wiring for motorized valves and chemical feed systems. |
|||||
Crum Water Treatment Facility Filtration Improvements |
|||||
Delaware County, Pennsylvania |
|||||
Electrical Engineering for improvements to the filtration system at the Crum Treatment Facility in Springfield PA. The project replaced an existing surface-wash system with a new air grid system in order to improve flow and water quality by making the backwash process more effective. Electrical work included SCADA wiring, valve control wiring, power to two 50 HP blowers, design of a blower control panel with soft starters and multiple remote control stations. |
|||||
Bristol Water Treatment Plant Residuals Process Improvement |
|||||
Bucks County, Pennsylvania |
|||||
Electrical Engineering for a new separating tank and polymer feed system to improve the solid residuals separation process for Bristol Water Treatment Plant. Electrical Engineering included electric service to a new building, a motor control center, power to pumps and valves, and control and instrumentation wiring. |
|||||
Pickering Water Treatment Plant Raw Water Intake |
|||||
Chester County, Pennsylvania |
|||||
Electrical Engineering for a new raw water intake and pumping station at Pickering East and West Water Treatment Plants. The project improves the raw water supply to two separate treatment facilities. Electrical Work includes new high voltage aerial distribution, loop fed switchgear, an outdoor substation, indoor motor control center, power and control wiring. |
|||||
![]() |
|||||
|